01
Clear scope of work
State exactly what work is being performed, in which rooms or areas, and to what finished standard.
Quote checklist
Before comparing totals, make sure you can tell what work is included, what is excluded, which materials are specified, how changes are handled and what happens if hidden conditions are discovered.
01
State exactly what work is being performed, in which rooms or areas, and to what finished standard.
02
Product type, grade, model or a real dollar allowance should be written into the estimate.
03
Square footage, linear feet, fixture counts or units let you check that bids measure the same job.
04
Confirm removal, haul-away, dumping fees and debris cleanup are included.
05
Look for subfloor, sheathing, wall or surface prep and whether repairs to them are priced or excluded.
06
Identify who pulls the permit, pays the fee and is present for inspections.
07
Anything not included — painting, electrical, patching, appliances — should be listed, not implied.
08
Expect a start window, an estimated duration and what the schedule depends on, such as material lead times.
09
Deposit size and each later payment should be tied to completed milestones, not calendar dates alone.
10
The estimate should explain how unexpected work is approved and priced before it begins.
11
Check how long the contractor stands behind the labor, separate from the manufacturer's product warranty.
12
Note how floors, landscaping and furnishings are protected and how the site is left each day.
13
If you buy anything yourself, confirm who handles delivery, damage and installation responsibility.
14
Hidden rot, wiring, asbestos or code upgrades should be named, with how they would be priced if found.
Do not assume the cheapest quote is incomplete or the highest quote is excessive. First identify whether the contractors are pricing the same scope.